Glyne Gap School

East Sussex County CouncilClient:  East Sussex County Council

Principle Contractor:  BTU Installation & Maintenance

Project Scope:  Replacement of heating, hot and cold water systems

Location:  Glyne Gap, Special Needs School, Bexhill, East Sussex

Year:  2015

 

 


The Project

 

Glyne Gap is a school for pupils ages 2-19 with severe and profound learning disabilities. Many of the pupils have additional needs including physical, medical, sensory and autistic spectrum conditions. 

 

Glyne Gap SchoolBTU was engaged to undertake a major overhaul of the school’s heating, hot and cold water systems – including periods when the pupils were attending the school.  

 

We needed to replace hot, cold and mains pipework throughout the school which meant upgrading cold water boosters, electrical connections and associated works, hot water generation and finally testing and commissioning.

To support ongoing operation and maintenance - an Operations & Maintenance manual was provided to the site manager/facilities team.

 


Challenges

 

Because of the type of work being undertaken in this sensitive environment during term time, the BTU Project Manager and staff worked closely with the school Management Team to minimise timetable disruption and potential distress to pupils. That all of our engineers and installers are DBS checked and have experience of working in sensitive environments provided great peace of mind to the school and parents.

 


Testimonial

 

 ‘We were delighted with BTU and their staff, who not only did a fantastic job in our school, delivering such a major project on time and in-budget! But, critically, they went the extra mile to ensure our staff and pupils were not affected by the noise and disruption that such a major job necessarily involves.’  Head Master XYZ  (needs to be validated by school).


Works Undertaken

 

Glyne Gap, Special Needs School – Bexhill

Major overhaul/redesign of the school’s heating, hot and cold water systems requiring:

  • Replacement of hot, cold and main pipework throughout school.
  • Replacement/refurbishment/installation of Cold water boosters.
  • Testing & commissioning of all systems.
  • Electrical Connections and associated works
  • Hot water generation
  • Production of an Operations and Maintenance Manual